Vehicles In Stock Vehicles Available Equipment For Sale
Service Bulletins Workshop Specifications Unimog Historical Timeline
Service Bulletins Workshop Specifications Development
EIC Services Offered
Unimog Badging Diesel Parts 404 Body Parts 404 Brake System 404 Chassis Parts 404 Crated Components 404 Electrical - Ignition 404 Engine 404 Best Sellers
Aftermarket Best Sellers Body Custom Soft Tops Drivetrain Electrical Ignition Pinz Carb Rebuild Parts Pinzgauer Exhaust System Suspension Transmission
Unimog Pinzgauer Jack Russell's Literature
Apparel Truck Gear Corbeau Seats Nato Gerry Cans Staun Products Webasto Products
Unimog Pinzgauer
Maintenance Tools POR-15 Products
Unimog Pinzgauer SBU Winch Plate Superwinch
Expedition Imports Corporation
B/banner
Shop our Store
O/obsolete_b
S/sale_a


P/pertronix_kit.jpg

EICSB102 - Pertronix Install

The Pertronix Ignitor is an excellent upgrade to the stock Pinzgauer ignition system. The installation can be done in under an hour, and the benefits are well worth it. The kit comes with the 4 components pictured below.

This is the method that we prefer when installing the Ignitor:

1. Remove the Distributor Cap (Leave wires attached).


2. Remove rotor and points.

P/petronix_disconnect_2_.jpg
3. Unscrew the shielded lead from coil to distributor, and remove (You will need to loosen the set screw that holds the green wire).

4. Remove the 17mm distributor fitting.


5. Drill the distributor fitting with a 7/32" drill bit, and re-install.

B/blank.jpg
6. Remove the Ignitor from the box. Take the "half moon" blank and install it into the distributor where the points use to sit.

7. Install the Ignitor module on top of the "half moon" blank and secure with the provided screw.


8. Take your wire cutters and cut 1/4" inch off of each of the black and red wire ends (This is so it will be easier to push through the distributor fitting and through the wire covering).


9. Take the red wire and route it under the condenser wire and out the distributor fitting.

P/petronix_wire_routing_2_.jpg
10. Take the black wire and route it under the condenser wire and out the distributor fitting.

11. Take one of the rubber wire grommets and spread the center apart (really small needle nose pliers work great for this) and push both the red and black wire through. Push grommet all the way down until it seats in distributor fitting.
W/wire_cover_2_.jpg
12. Take the wire shielded cover and remove the green wire. Push the shielding towards the center and expand it (think of Chinese Handcuffs). Nnow take the red and black wires together and feed them through the shielding. I find that turning the shielding in a circle as I feed the wires through works well. The top half of the photo is the shielding pulled tight, the bottom half is the shielding expanded to get the wires through.
13. Tighten down the distributor end of the wire shielding, and pull the shielding back to its normal size.


14. Measure up the shielding 2-3 inches and using the pointy nose pliers make an opening in the shielding and pull the red wire out through the shielding.


15. Take the second rubber grommet and slide over the black wire and up into the wire shielding. Slide the rigid tube over the black wire and cut the wire 1/8" longer than the end of the rigid tube, splay the wire out screw on the metal cap. You are connecting the black wire to the coil exactly the same way the green wire was connected.


16. Screw the shielded wire into the coil.


17. Measure 4"-7" on the red wire and cut. Strip off last 1/4" of wire. Unscrew INPUT side of radio noise suppressor, and attach red wire at this same point.


18. Take the round inductor magnet and line up the lobes and press onto distributor main shaft. This may push on very tight, just make sure you are lined up with the lobes.

R/rotor_bug_2_.jpg
19. Take the rotor and remove 1/8" off of the bottom. THIS MUST BE DONE. If it is not done the rotor will not seat all of the way down on the distributor shaft. I prefer to use a stationary belt sander in order to shorten my rotors, although a bench grinder will also work.

20. Install the rotor and put the distributor cap back on. Time the pinz setting the ignition 3-5 degrees BTDC.
Your Shopping Cart
0 Items: $0.00
Shipping: $0.00
Total: $0.00
E/events_a_v3.gif
C/contact.gif
Subscribe to our Newsletter
Best Sellers
Bubleak 10 oz - Airline Leak Detector
Bubleak 10 oz - Airline Leak Detector
Hub Reduction Casting - Inner
Hub Reduction Casting - Inner
Pinzgauer 710/712 Parts Manual
Pinzgauer 710/712 Parts Manual
Copyright © 2008. Please read our Privacy and Returns Policies. 
E-Commerce solution provided by Zoovy.
Contact us Company Info Account Login FAQ View Cart Checkout